LOAD and UNLOAD phases
During the LOAD phase,
custom(ADM)
transfers all the selected packages from the source media
to the target media, in preparation for installing the local system,
diskless clients of the local system, or remote systems across the network.
LOAD creates the /opt portion of the SSO.
NOTE:
You can legally load a component onto a system on which the
component cannot run;
for example, the administrator might want to load the component on
a server and ATTACH it to network clients without
attaching it to the server.
pre step-
ccs PRE_LOAD keyword list package list
Only the files in the SharedControl package of the
component are loaded on the target.
system step-
If disk space is at a premium,
custom might execute the remove procedure for the
old component.
custom moves the files from the distribution media
to the SSO on the hard disk.
post step-
ccs POST_LOAD keyword list package list
During the UNLOAD phase,
custom(ADM)
removes the /opt portion of the component's SSO.
pre step-
ccs PRE_UNLOAD keyword list package list
system step-
custom removes /opt.
post step-
ccs POST_UNLOAD keyword list package list
The only files that remain after a full removal are the files
in the component's control package
(the files in the SSOroot/cntl directory).
Next topic:
ATTACH and UNATTACH phases
Previous topic:
Software management phases
© 2003 Caldera International, Inc. All rights reserved.
SCO OpenServer Release 5.0.7 -- 11 February 2003